Process:
BLACK ANODIZE, MIN ETCH, MIN BUILD-UP TO ACHIEVE COLOR. PLEASE RACK IN 3/16" DIAMETER HOLE. DO NOT RACK IN CENTER HOLE. ***SEE ALEX ABOUT ETCH TIME*** (normally 30 sec)
Remarks:
RACK ON FACTORY SEMI WEAK RACKS ALL RACKS W/EQUAL COUNTS HOLD. SOAK 5 Min, ETCH 30 SECONDS AFTER SPRAYING TOP OF ETCH, DEOX 5 MIN., ANODIZE 1 HOUR 10 MINUTES 16 VOLTS, EQUAL LOADS, DYE 1 HOUR.THESE PARTS HAVE CRITICAL TOLERANCES. SHOULD IT BE REQUIRED, PLEASE CONTACT US PRIOR TO STRIPPING ***PLEASE PACK PARTS BACK IN SAME CLEAN TRAYS THEY WERE SENT IN***CERT MUST SAY BLACK ANODIZE ROHS COMPLIANT WITH PN & REV 6***RUN AT 70 DEGREES ONLY, MAKE AN ADD TO THE DYE AND ALSO DO A TEST ON THE ANODIZE EVERYTIME**MINIMUM ETCH AND BUILDUP**